Decide early, when it costs the least.
Every project has a window when a new idea is easy to absorb. Move through a project below and watch the work build step by step, while the room to change course closes.
Ability to shape: Cost of a change:
Most of the work happens in VFX and shop drawings, while ideas are still easy to change, so production and installation run calm.
Your 5 Simple Steps name who holds each decision, so nothing waits on a question nobody knew to ask.
Before it, a change is a drawing. After it, a change is new material, a contract adjustment and a new place in the schedule.
Architect Patrick MacLeamy introduced the curve in 2004 to show why design effort belongs early in a project. We borrowed it for our own workflow because the same principles apply directly to custom cabinetry.
Read more: Patrick MacLeamy.